A good place to begin.
A plain solid tile to learn bed preparation, the first layer, cooling and removal. Check dimensions after cooling.
YOUR PRINT & BUILD DESK
The files and records for modules 17–35: practice your first print, identify the robot’s real parts, and keep a traceable build. Start with the tile before filling a plate with robot parts.
Open the shopping list & tools → Download the print & build kitFIRST PRINTS / GUBI LABS TEACHING FILES
A plain solid tile to learn bed preparation, the first layer, cooling and removal. Check dimensions after cooling.
Five holes reveal how your material and profile affect fit. The smallest hole is at the left in this diagram; mark that side. Do not force or heat a fastener through it.
These original teaching models have been checked for valid solids, dimensions and closed meshes. They have not been physically printed. They are not BDX-R structural parts. Import STL in millimeters and verify dimensions. Slice for your actual X2D, installed nozzle and chosen material; no G-code or production print profile is supplied.
Follow the first-print lab →THE ROBOT / PINNED PRIMARY SOURCES
Kayden’s published CAD assembly, approximately 95 MB. Open a copy in FreeCAD and follow the inspection lab. STEP provides solids and placement, but it does not supply a verified print queue or a parametric design history.
CAD revision e63b081d…Unknown fields stay unresolved. Continue the software and practice-print labs while you gather the missing evidence.
WORKSHOP RECORDS
81 reference meshes, inspection categories and blank release fields. Not a verified bill of materials.
CSV · build-workbook.csvRecord the file, slicer project, orientation, settings, time and measured result.
CSV · print-log.csvAssign color to a part and material to a purpose before arranging plates.
CSV · color-plan.csvRecord revision, fit, access, fastener decisions and inspection at each assembly.
CSV · assembly-checklist.csvMap the 16 planned physical axes; resolve the 14-axis deployment configuration.
CSV · joint-map.csvRecord pinout evidence, voltage, connectors, protection and continuity checks.
CSV · wiring-schedule.csvWrite the hypothesis, limits, stop conditions and result before each test.
CSV · test-card.csvTrack added mass, power, clearance, model changes and regression tests.
CSV · modification-budget.csvWork through support, isolation, charging confirmation and fault scenarios.
CSV · docking-test-plan.csvThe offline Python mock runs a nominal sequence and 12 fault cases. It has no hardware, network or charger connection. The states are a teaching foundation for your later docking project.
python docking_mock.pyPART IDENTIFICATION / 81 SIMULATION REFERENCES
Names and hashes come from description revision 3a7fad94…. Categories below are an initial filename-based triage, not engineering approval. No quantity is inferred. Open the source to inspect a mesh; use the master STEP and release workbook to decide how the real component should be made.
81 reference meshes shown